Additional information is available at tools.ietf.org/wg/adslmib
Chair(s):Operations and Management Area Director(s):Operations and Management Area Advisor: |
The working group will define:
1. A set of managed objects to handle the bonding of xDSL lines
according to the ITU-T Recommendations G.998.1 (ATM), G.998.2 (Ethernet)
and G.998.3 (TDIM). A common MIB module will be developed to handle the
common objects and three specific MIB modules will be developed to
handle the three separate layer-2 technologies. Use will be made of the
ifStack and ifInvStack Tables defined in RFC 2863 and RFC 2864
respectively. Use will also be made of the ifCapStack and ifInvCapStack
tables as defined in RFC 5066. The Broadband forum TR-159 will be used
in the definition of these MIBs.
2. The working group will develop a set of managed objects as an
optional extension to RFC 5650 that shall provide an alternative
approach, known as the "Vector of Profiles", for the configuration of
DSL lines. The Vector of Profiles MIB will be based on the Broadband
Forum TR-165 document. The ITU-T G.997.1 will also be considered in the
definition of this extension.
The MIB modules defined by this group will be generated using SMIv2,
will be consistent with the SNMP management framework, and will
describe the relationship of the objects defined to existing MIBs such
as those described in other work products of this Working Group, the
interfaces MIB, the Ethernet MIB modules and the AToM MIB.
Done | Submit Internet-Draft to cover subscriber equipment | |
Done | Meet at Chicago IETF to review Internet-Drafts | |
Done | Submit Internet-Draft to IESG for consideration as Proposed Standard. | |
Done | Meet at Oslo IETF to review new Internet-Drafts and discuss implementation experience on initial MIB | |
Done | Submit supplementary Internet-Draft to IESG for consideration as Proposed Standard. | |
Done | Produce Internet-Draft covering HDSL2 management objects. | |
Done | Submit updated HDSL2/SHDSL Internet-Draft | |
Done | Complete WG last call for HDSL2/SHDSL management objects | |
Done | Collect implementation reports for ADSL MIB | |
Done | Submit HDSL2/SHDSL MIB to IESG for consideration as Proposed Standard | |
Done | Submit initial Internet-Draft VDSL MIB | |
Done | Complete WG last call on VDSL MIB | |
Done | Submit updated VDSL MIB Internet-Draft | |
Done | Submit final VDSL MIB Internet-Draft | |
Done | Submit VDSL MIB to IESG for consideration as Proposed Standard | |
Done | New WG I-Ds for the LCS MCM and SCM MIB modules | |
Done | Initial WG Internet-Draft covering ADSL2 management objects | |
Done | Integrate working group changes and produce revised draft | |
Done | Complete WG last call on ADSL2 MIB | |
Done | Submit ADSL2 MIB to IESG for consideration as Proposed Standard | |
Done | Re-charter or close down | |
Done | Initial WG Internet-Draft covering VDSL2 management objects | |
Done | Inform the ITU-T and DSL Forum that work on the VDSL2 MIB has begun | |
Done | Integrate working group changes and produce revised VDSL2 MIB draft | |
Done | Post Initial Drafts of all the xDsl Bonding MIB drafts | |
Done | Post Vdsl2 draft version 03 | |
Done | Post Vdsl2 draft version 04. | |
Done | Complete Thorough Working Group Reviews of the Vdsl2 draft and produce version 05. | |
Done | Working Group Last Call for the Vdsl2 document. | |
Done | Early MIB Doctor Reviews of the Vdsl2 draft. | |
Done | Make Correction to the draft following the review. | |
Done | Working Group Last Call for the Vdsl2 document following corrections. | |
Done | Present the Vdsl2 document to the IESG. | |
Feb 2010 | Submit updated ATM and Ethernet G.Bond MIB drafts. | |
Mar 2010 | Initial Vector of Profiles draft to be accepted by the Working Group. | |
Apr 2010 | Submit G.Bond MIB and TDIM MIB Drafts | |
Apr 2010 | Submit Vector of Profiles Draft version 01 | |
May 2010 | Working Group Last Call on all the G. Bond documents. | |
Jun 2010 | Submit G.Bond documents to IESG as Proposed Standard | |
Jun 2010 | Revise the draft and post vector of Profiles draft version 02. | |
Jul 2010 | Working Group Last Call for the Vector of Profiles draft. | |
Aug 2010 | Post Vector of Profiles Draft version 03. | |
Sep 2010 | Submit the Vector Of Profile document to the IESG as Proposed Standard. | |
Oct 2010 | Re-charter or close down. |