Skip to main content
  • The new GREEN working group gets ready for an energy efficient Internet

    The Getting Ready for Energy-Efficient Networking (GREEN) working group will explore use cases, derive requirements, and provide solutions to optimize energy efficiency across the Internet.

    29 Oct 2024
  • IETF Annual Report 2023

    The IETF Annual Report 2023 provides a summary of Internet Engineering Task Force (IETF), Internet Architecture Board (IAB), Internet Research Task Force (IRTF), and RFC Editor community activities from last year.

    25 Oct 2024
  • IETF 122 Bangkok registration open

    Registration is now available for the IETF 122 Bangkok meeting scheduled for 15-21 March 2025, which is the first time registration for an IETF meeting has been open before the preceding meeting registration has closed.

    25 Oct 2024
  • First Impressions from the IAB AI-CONTROL workshop

    The Internet Architecture Board (IAB) organized a workshop on 19-20 September 2024 to discuss issues around and possibilities for practical mechanisms that publishers of data on the Internet could employ to opt out of use by the Large Language Models and other machine learning techniques used for Artificial Intelligence (AI).

    24 Oct 2024
  • New Participant activities at the IETF: Major expansion coming for IETF 122!

    The IETF New Participants program has a long history of helping people just starting out in the IETF be more effective. Based on feedback from program participants over the past two years, and in consultation with the Internet Engineering Steering Group (IESG), the program will be significantly enhanced starting with IETF 122 Bangkok.

    22 Oct 2024

Filter by topic and date

Filter by topic and date

IETF Website Status Update

18 Dec 2017

Thanks to everyone who provided further input about the revamped www.ietf.org website around IETF 100.

This was the third round of IETF community input this year.  In addition, we gathered input from people for whom the IETF is important but don’t necessarily participate in the IETF. This input has led to a better revamped website in a variety of ways, such as organizing the content to make it more intuitive to access for people new to the IETF, improving accessibility, and making it work better on mobile devices.

The latest round of input from IETF participants raised a few additional points to be addressed:

  • Some feedback noted that the “Quick Links” page accessible via 1-click (via the “Tools” top-menu item) from anywhere in the www.ietf.org website was difficult to parse. In response, the layout for displaying the items/links has been updated.  See https://beta.ietf.org/links/.  And, of course, this can be further refined.
  • It was also suggested that the meeting pages on the new site follow the current practice of making all the links immediately visible. The content management system template for those pages will be updated to make all meeting pages are displayed that way by default.

There were a few additional comments about things such as the crispness of font display, vertical padding, and font sizes but it was not clear to what extent these are general issues or what action might be taken at this point to address them. Feedback to improve the website is encouraged and can be submitted via webmaster@ietf.org.

Based on the input received, the current plan is to move the revamped website to production on 11 January 2018. This plan has been shared with the Community Review Committee established by the IETF website revamp project’s Scope of Work, with IETF Tools team, and with the IAOC and the IESG.

While the goal is to anticipate and implement measures needed to ensure a smooth transition, the IETF Secretariat and the web development vendor are prepared to pay extra attention to fixing quickly any issues that arise in the weeks after the cut over to production.

URL continuity will be an area of focus during the transition. Based on the experience of previous IETF website transitions, there will likely be some URLs that end up resolving differently after the new website goes into production. Specific plans for maintaining continuity for all the URLs specified the SOW, as well as others identified in the process of the website development, will be documented and, to the extent possible, tested before the move to production takes place.

For the past few months, in preparation for the cut over, we have been maintaining two parallel websites. That work needs to stop are soon as possible.The existing website will continue to exist in its current state, and will accessible in some manner, just as the previous website does at https://www.ietf.org/old/2009/.  The URL for that has not yet been decided, but will be determined before the new website goes live.

update 2022-04-18: the beta.ietf.org site is no longer available; as of this date, the previous www.ietf.org website is available at www6.ietf.org


Share this page